Maintenance works on Valero Jetties by Crane Barge – Slow Passing required.
1. MARINERS ARE HEREBY ADVISED that, commencing 30th August 2023, crane barge operations from KAREL-VICTOR will take place at Valero berths 2 and Valero 3 as well as at the Valero RoRo Berth, Mainstay North Wall and Port of Pembroke Quay 1. Works are scheduled to take four weeks.
2. Barge KAREL-VICTOR will be equipped with a heavy lift crane and will carry out various lifting operations. The barge will be towed between the berths by tug Willpower and be assisted by tug Willendeavour.
3. Mariners are required to pass at slow speed with minimal wake and to navigate with caution when in the area of the barge during operations.
4. The tugs will maintain a listening watch on VHF Ch12 at all times during operations and manoeuvres.
5. For details of heavy lift operations please contact Milford Haven VTS on 01646 696136/7.
6. Admiralty chart 3274, 3275 and Imray Y26 & 2600 ATLAS refer.
7. This notice will self-cancel at 2359 on Friday 29th September 2023
BY ORDER
M RYAN
HARBOURMASTER
Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP
Tel: 01646 696100
Email: enquiries@mhpa.co.uk