Control depth for Valero Pembroke Oil terminal Berth 3 has been reduced from 10m to 7.5m.
- MARINERS ARE HEREBY ADVISED that, the control depth for Valero Pembroke Oil terminal Berth 3 has been reduced (see chart below).
- The reduction is introduced pending further investigation of the obstruction identified in NTM 98 of 2023.
- Admiralty chart 3275, and Imray Y26 & 2600 ATLAS refer.
Berth |
Old (m) |
New (m) |
Notes |
VPOT 3 |
10.0 |
7.5 |
 Pending investigation of obstruction |
BY ORDER
M RYAN
HARBOURMASTER
Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP
Tel: 01646 696100
Email: enquiries@mhpa.co.uk