Control depth for Valero Pembroke Oil terminal Berth 3 has been reduced from 10m to 7.5m.

  1. MARINERS ARE HEREBY ADVISED that, the control depth for Valero Pembroke Oil terminal Berth 3 has been reduced (see chart below).
  2. The reduction is introduced pending further investigation of the obstruction identified in NTM 98 of 2023.
  3. Admiralty chart 3275, and Imray Y26 & 2600 ATLAS refer.

Berth

Old (m)

New (m)

Notes

VPOT 3

10.0

7.5

 Pending investigation of obstruction

BY ORDER
M RYAN
HARBOURMASTER

Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP

Tel: 01646 696100
Email: enquiries@mhpa.co.uk