A floating tidal energy device and platform will be deployed at the META Warrior Way site from 15th September to 31st October 2025.

  1. MARINERS ARE HEREBY ADVISED that, a 10m x 6m floating platform and tidal energy device will be deployed at the META Warrior Way site between 15th September and 31st October 2025.
  2. The platform will be on a swinging mooring in position 51°42.224’N 004°55.610’W and will be marked with:
    A yellow day cross and flashing yellow light as the main navigational light.
    Steady yellow lights on each side of the platform.
  3. When the platform is not on the mooring, the mooring will be marked with a large unlit yellow buoy (approx. 1m diameter x 1.5m high) with reflective tape for night visibility.
  4. The platform and mooring will be removed on or around 31st October 2025, after which a cancellation Notice will be issued.
  5. Mariners are requested to navigate with caution and allow a safe berth when transiting the area.
  6. Admiralty Charts 3275, IMRAY Y26, and 2600 Atlas refer.

BY ORDER
M RYAN
HARBOURMASTER

Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP

Tel: 01646 696100
Email: enquiries@mhpa.co.uk