A floating tidal energy device and platform will be deployed at the META Warrior Way site from 15th September to 31st October 2025.
- MARINERS ARE HEREBY ADVISED that, a 10m x 6m floating platform and tidal energy device will be deployed at the META Warrior Way site between 15th September and 31st October 2025.
- The platform will be on a swinging mooring in position 51°42.224’N 004°55.610’W and will be marked with:
• A yellow day cross and flashing yellow light as the main navigational light.
• Steady yellow lights on each side of the platform. - When the platform is not on the mooring, the mooring will be marked with a large unlit yellow buoy (approx. 1m diameter x 1.5m high) with reflective tape for night visibility.
- The platform and mooring will be removed on or around 31st October 2025, after which a cancellation Notice will be issued.
- Mariners are requested to navigate with caution and allow a safe berth when transiting the area.
- Admiralty Charts 3275, IMRAY Y26, and 2600 Atlas refer.