From 20th July 2023 for approx. 5 days, the Cable Laying Vessel “MV CONNECTOR” will be conducting a Pre-Lay Survey off the entrance to the Port.
- MARINERS ARE HEREBY ADVISED that, from 20th July 2023 for approx. 5 days, the Cable Laying Vessel “MV CONNECTOR” will be conducting a Pre-Lay Survey off the entrance to the Port.
- The MV Connector is a DP3 Class Cable Laying Vessel, 157m LOA, and will display appropriate lights and day shapes as per the regulations.
- The vessel will be deploying a dived Remote Operated Vessel (ROV), mariners are requested to pass no closer than 0.5nm and keep wash to a minimum.
- Please see Chart 1 for overview of the Greenlink Cable, and Chart 2 for details within Port Limits.
- Vessel will maintain listening watch on VHF CH12 whilst within Port Limits and liaise with VTS for other large vessel movements.
- Admiralty Chart 2878 (Approaches), 3273 (Entrance), 3274 (West Haven and Imray Y26 & 2600 ATLAS refer.
- This notice will be cancelled when the Pre-Lay Survey is completed.
BY ORDER
M RYAN
HARBOURMASTER
Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP
Tel: 01646 696100
Email: enquiries@mhpa.co.uk