Mid Channel Rock Beacon Works taking place from 28th June for approximately one month.
- MARINERS ARE HEREBY ADVISED that from 28th June 2023 for approximately 1 month, a Jack Up Barge (JUB) will be located close to the East side of the Mid Channel Rock Beacon in approx. position 51 40’18.8 N; 005 09’49.6W, whilst the beacon undergoes refurbishment.
- During these works the beacon light will be relocated approx. 30m to the West in position 51 40’18.8N; 005 09’48.4W, retaining same height and characteristics. There is expected to be no change to weather data from this station.
- During the works there will be several smaller work boats in the immediate area and on transit to and from Milford Docks, all showing the appropriate lights and shapes as per the regulations.
- Diving on the beacon will be running simultaneously.
- Mariners are instructed to give the beacon and works a wide berth of 100m and pass at reduced speed to minimise wake.
- Admiralty Chart 2878 (Approaches), 3273 (Entrance), 3274 (West Haven), and Imray Y26 & 2600 ATLAS refer.
- This notice will be cancelled when all works are completed.
BY ORDER
M RYAN
HARBOURMASTER
Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP
Tel: 01646 696100
Email: enquiries@mhpa.co.uk