A floating tidal energy device and platform will be deployed at the META Warrior Way site from 2nd March 2026 to 30th April 2026.

  1. MARINERS ARE HEREBY ADVISED that a 10m x 6m floating platform and tidal energy device will be deployed at the META Warrior Way site between 2nd March 2026 to 30th April 2026.
  2. A swinging mooring will be deployed (week commencing 23rd February 2026, weather permitting) in position 51°42.224’N 004°55.610’W. The platform will be established on this mooring from 2nd March 2026 and will be marked with: 
    • A yellow day cross and flashing yellow light as the main navigational light.
    • Steady yellow lights on each side of the platform.
  3. When the platform is not on the mooring, the mooring will be marked with a large unlit yellow buoy (approx. 1m diameter x 1.5m high) with reflective tape for night visibility.
  4. The platform and mooring will be removed on or around 30th April 2026, after which a cancellation Notice will be issued.
  5. Mariners are requested to navigate with caution and allow a safe berth when transiting the area.
  6. Admiralty Charts 3275, IMRAY Y26, and 2600 Atlas refer.

BY ORDER
M RYAN
HARBOURMASTER

Port of Milford Haven