A floating tidal energy device and platform will be deployed at the META Warrior Way site from 2nd March 2026 to 30th April 2026.
- MARINERS ARE HEREBY ADVISED that a 10m x 6m floating platform and tidal energy device will be deployed at the META Warrior Way site between 2nd March 2026 to 30th April 2026.
- A swinging mooring will be deployed (week commencing 23rd February 2026, weather permitting) in position 51°42.224’N 004°55.610’W. The platform will be established on this mooring from 2nd March 2026 and will be marked with:
- A yellow day cross and flashing yellow light as the main navigational light.
- Steady yellow lights on each side of the platform.
- When the platform is not on the mooring, the mooring will be marked with a large unlit yellow buoy (approx. 1m diameter x 1.5m high) with reflective tape for night visibility.
- The platform and mooring will be removed on or around 30th April 2026, after which a cancellation Notice will be issued.
- Mariners are requested to navigate with caution and allow a safe berth when transiting the area.
- Admiralty Charts 3275, IMRAY Y26, and 2600 Atlas refer.
BY ORDER
M RYAN
HARBOURMASTER
Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP
Tel: 01646 696100
Email: enquiries@mhpa.co.uk