Electrical works at Dragon LNG jetty on Thursday 18th April may affect navaids.
- MARINERS ARE HEREBY ADVISED that, planned electrical works due to take place at Dragon LNG jetty on Thursday 18th April 2024 may result in the following lights and aid to navigation being unreliable:
Dragon LNG No.1 berth W End |
2FR(vert) |
51°42.00’N 005°00.02’W |
Dragon LNG No. 1 berth E End |
2FR(vert) |
51°41.99’N 004°59.99’W |
Dragon Terminal W End |
3FR(vert) |
51°42.03’N 005°00.01’W |
Ldg Lts 090-83°. Front |
FBu |
51°42.03’N 005°00.01’W |
Ldg Lts 090-83°. Rear |
FBu |
51°42.03’N 004°59.37’W |
2. Mariners are required to navigate with caution in the area.
3. Admiralty charts 3274 and 3275 and Imray Y26 & 2600 ATLAS refer.
4. A further notice will be promulgated when the lights and aid to navigation are fully restored.
BY ORDER
M RYAN
HARBOURMASTER
Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP
Tel: 01646 696100
Email: enquiries@mhpa.co.uk