MARINERS ARE HEREBY ADVISED that between 29th May 2023 and 2nd June 2023, Crane Barge operations will take place at South Hook LNG Terminal Berth 2, (approximate position 51°41’ 52.46N 005°04’ 38.62W) and will be conducted from the Crane Barge “KAREL-VIKTOR”, using the tug “WILLPOWER” and assisted by the tugs “WILLENDEAVOUR” and “WILLSUPPORT”. The “WILLPOWER” will monitor VHF Channel 12.
- MARINERS ARE HEREBY ADVISED that between 29th May 2023 and 2nd June 2023, Crane Barge operations will take place at South Hook LNG Terminal Berth 2, (approximate position 51°41’ 52.46N 005°04’ 38.62W) and will be conducted from the Crane Barge “KAREL-VIKTOR”, using the tug “WILLPOWER” and assisted by the tugs “WILLENDEAVOUR” and “WILLSUPPORT”. The “WILLPOWER” will monitor VHF Channel 12.
- The “KAREL-VIKTOR” will be towed daily from the Port of Pembroke to South Hook Berth 2, with tugs made fast on the side of the barge, and then return to Port of Pembroke on completion of each day’s work.
- When alongside at South Hook Berth 2, mariners will be instructed by VTS to use the South Channel where possible, to give the crane and towage operations a wide berth and pass at slow speed.
- Admiralty Chart 3274 (West Haven), 3275 (East Haven), and Imray Y26 & 2600 ATLAS refer.
- This notice will self-cancel at 2359hrs on 2nd June 2023.
BY ORDER
MIKE RYAN
HARBOURMASTER
BY ORDER
M RYAN
HARBOURMASTER
Port of Milford Haven
Gorsewood Drive
Hakin
Milford Haven
Pembrokeshire
SA73 3EP
Tel: 01646 696100
Email: enquiries@mhpa.co.uk